Customization: | Available |
---|---|
Condition: | New |
Bottom Raw Material: | Turpentine |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name: Acrylic bathtub for small-sized households with limited space | |||||||||
Product size: 130*70*60cm/150*80*60cm | |||||||||
Raw material : Acrylic | |||||||||
Flange: Keep out water on both sides | |||||||||
Faucet: It needs to be purchased by yourself | |||||||||
Bottom material :Damp and mildew proof Osung board and use the fiberglass let them strong | |||||||||
Insepection way : we have customzied special glass stand test water | |||||||||
Drain hole:on the corner | |||||||||
we have over 10 styles ready mold |
We can stack and customize cartons according to your requirements. Mixed sizes can be ordered. We have a stable freight forwarder can quickly reach your hands.Packing & Container Loading
We use strong wooden crates with reinforced straps or wooden bundles outside with fumigation. Sometimes, it will also use cartons inside for some products. After the products are packed well, professional workers will load them and fixed them carefully into the container, to avoid breakage during the transportation.
There are several steps as follows:
1. Preparation before Installation
Test for Water Leakage of the Drainage: Before installation, first install the drainage fittings. Fill the bathtub with water, close the drain, and check for any water leakage. Pay special attention to the sealing of the overflow opening.
Plan the Location: Based on the size of the bathtub and the layout of the bathroom, determine the placement position of the bathtub, and ensure that the center point of the mixer tap aligns with the center point of the width of the bathtub.
2. Leveling and Fixing of the Bathtub
Leveling: When placing the bathtub, ensure that the end of the drain outlet is slightly lower than the other end to ensure smooth sewage discharge. If there is already a drainage slope at the bottom of the bathtub, no special adjustment is required.
Filling with Sand: For cast iron bathtubs, medium river sand needs to be laid at the bottom and compacted to enhance stability and heat insulation. Before filling with sand, seal the drain outlet with silicone sealant to prevent sand from entering the pipeline.
3. Installation of the Skirt Board and Tile Laying
Installation of the Skirt Board: The bottom of the skirt board should be closely attached to the ground, and a hole with a size of 250-300mm should be reserved at the drainage place for easy drainage installation. At the same time, set up an access hole on the wall at the end of the drainage.
Tile Laying: When laying tiles on the bathtub skirt, pay attention to aligning the joints with the floor tiles and wall tiles to enhance the aesthetic appearance. Before laying tiles, apply a layer of cement mortar on the surface and wait for two days to ensure firmness.
4. Connecting the Drainage and Testing
Connecting the Drainage Pipe: Connect the bathtub drainage pipe to the floor water outlet, ensuring a firm connection and easy disassembly. The connection part should not be open to prevent water leakage.
Testing the Drainage: After the installation is completed, conduct a drainage test. Observe whether the drainage speed is normal and check whether water overflows from the bottom of the bathtub.
5. Installation of the Tap and Shower Head
Installation of the Tap: The height of the cold and hot water tap or the mixer tap should be 150mm higher than the upper surface of the bathtub. When installing, pay attention to protecting the chrome plating layer and ensure that the chrome cover is closely attached to the wall.
Fixing the Shower Head: Install a fixed or flexible hose shower according to your needs to ensure convenient use.
6. Protection and Maintenance after Installation
Protecting the Bathtub: If there is still construction work after installation, the bathtub can be wrapped with a cardboard box to prevent the surface from being scratched.
Applying Silicone Sealant: Apply mildew-proof silicone sealant to the places where the bathtub contacts the skirt platform and the wall to keep the bottom of the bathtub dry and extend its service life.
1. We have over 10 set ready mold .
2, 10-15 days can send out 60feet container
3, We are one of industry and trade, we are our own purchased factory.
4,Fast open mold . 30days can open 10 set molds.
5, My boss in this area over 20 years experences.
6, we are OEM MANY famous brand.
Question: why you choose our factory shower pan
Answer: 1,Becuase of same industry and trade company order to us . Integration of industry and trade. Our foreign trade business has high
communication skills and professionalism
2, we are bottom material use the Oriented strand board most of factory use the normal wood .
3, our boss have over 25 years expriences in this area
4,We give domestic and foreign well-known brand OEM
5, Mold time is only 15 days. 1*40 feet container only need 10 days can send out
6,we have over 100 style shower base and bathtub you can selected.
Question: How Long Does It Take to Get Product After Placing the Order?
Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.